Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 



Description:
The construction of an 18m long x 8m wide single span box girder bridge. This structure was purpose built to replace an environmentally non-compliant culvert.

This structure was founded on piling with a pre-cast integral cap / wing wall design.

The project was completed over a four day road closure to minimize disruption to road commercial activity.


 
Principal Client: Finlay Forest Industries
Client
Contact:
Name:

Position:

Address:

Phone:

Fax:
Les Skaalid

Woods Manager

Mackenzie
Scheduled Design Delivery: March 1999 Actual Design Delivery: March 1999
Reason for Delay: n/a
Significant Changes Made
During Construction:
Designed to maintain road width and provide for safe fish passage.
Team Members Involved: All-North Consultants
Key Personnel: •Rod Cleave site superintendent
• Chris Ebert site foreman
Relevant Skills: Replace a critical road link over a four day closure.
Safety & WCB Record: No lost time accidents.
Enviornmental Record: No environmental incidents.
Quality Management Experience: All materials delivered and installed as per the specifications.
Services Used: Industrial Bridge Construction

Concept Through Construction