Description: This project involved the installation of an aerial pipeline truss over Silver Hope Creek, near Hope, BC.  Ruskin constructed 2 piers with drilled piles, and then installed a 110 meter truss using three (3) cranes – 110 ton, 200 ton, and 270 ton.  Allnorth Consultants Ltd. completed the engineering for the pick and place of the truss.
Click thumbnails to view full size images of the Spectra Enegry Pipeline Project.
   
 
Client: Spectra Energy Transmission
Location: Hope, BC
Project Dates: 2007
Ruskin Key Personnel:
Joseph Hanna
Jody Keeling
Brad Soltani
Team Members:
Allnorth Consultants Ltd.
Client Contact:
Spectra Energy
P.O. Box 11162
Suite 1100 – 1055 West Georgia Street
Vancouver BC V6E 3R5
Phone: (604) 691-5500






Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge