Description: This project involved the construction of three new berthing dolphins for a DND 8000 Tonne fuel barge, including steel pipe piles, concrete pile caps and fendering. New steel grating and steel beam walkways were supplied and installed to the new dolphins along with repairs to the existing wood structure including a complete deck and handrail as well as some wood piling and cap replacement. Ruskin Construction utilized the services of various local contractors for the civil, mechanical and electrical works.
Click thumbnails to view full size images of the POL Fuel Jetty Project.
   
 
Client: DCC
Location: CFB Comox, BC
Project Dates: 2007
Ruskin Key Personnel:
Greg Brown
John Ellis
Client Contact:
Brian Hughes, DCC
Phone: 250-339-8211






Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge