| Principal
Client: |
Slocan Group
Mackenzie Operations |
Client Contact: |
Name: Position: Address:
Phone: Fax: |
Brent
Sinclair, RPF Operations Superintendent PO Box 310
Mackenzie, BC, V0J 2C0 (250)997-2582 (250)997-2582 |
| Scheduled Delivery: |
April 2000 |
Actual
Delivery: |
April 2000 |
| Reason for
Delay: |
n/a |
Significant Changes
Made During Construction:
|
n/a |
| Team Members
Involved: |
SureSpan
Construction Ltd. |
| Key
Personnel: |
Andrew Purdey/Greg Brown Duties: Provide project construction team to
deliver a safe and on schedule project.
Responsibility: Prepare construction
procedures, execution of safety and operational plan. Manage logistic of
material deliveries to ensure steady flow of construction. Work with all
stakeholders to deliver the project on time in harsh winter conditions.
|
| Relevant Skills: |
Working with a
client to deliver a product, which satisfied all schedule and design needs,
while bringing the project in under budget. |
| Safety
& WCB Record: |
This
project required the constant flow of construction traffic through the site,
detours and signage insured no incidents. |
| Environmental Record: |
All work was
completed within the guidelines presented by the controlling agencies. |
| Quality Management Experience: |
All materials and
services supplied to specification. |
| Services Used: |
Industrial Bridge Construction
Pile Driving
Temporary Bridge
Rental/Purchase |