| Principal
Client: |
Takla Forest
Management Inc. |
Client Contact: |
Name: Position: Address:
Phone: Fax: |
Eric
Stringer Construction Manager 1108 Sluggett Road
Brentwood Bay B.C. V8M 1E9 (250) 564-8761 (250) 564-8761 |
| Scheduled Delivery: |
July 1997 |
Actual
Delivery: |
July 1997 |
| Reason for
Delay: |
n/a |
Significant Changes
Made During Construction:
|
n/a |
| Team Members
Involved: |
Ruskin Construction
Ltd. |
| Key
Personnel: |
Andrew Purdey Duties: Provide contract Management, and
prepare resources for project execution. Prepare the design build proposal.
Responsibility: Review projects schedule and
costs weekly, direct the allocation of resources and construction
procedures. Rod Cleave
Duties: Provide day to day
on site project management.
Responsibility: Maintain daily schedule and
cost control trouble shoot and changes to site conditions. |
| Relevant Skills: |
This project is
located near the subject job site, we undertook the hiring of local workers
from the Takla band office, adn preformed the construction systematically with
access to one side of the structure only. |
| Safety
& WCB Record: |
This
project required water access to each pier location, no infractions or lost
time accidents were reported. |
| Environmental Record: |
This project was
completed in a sensitive management area, which required our construction plan
to address all Environmental issues. No infractions or incidents occurred on
this site. |
| Quality Management Experience: |
Provided all
materials and services to the requirement of the specification. |
| Services Used: |
Industrial Bridge Construction
Concept Through Cosntruction |