Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omenica River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 



Description:
This 110m multi-span structure located near Lovell Cove B.C., was constructed within an environmentally sensitive area with access to the camp side abutment only. The project required the logistics of moving materials and equipment to a remote logging camp by method of existing road systems. Having no access to the woods end, and required the use of working from the camp end abutment forward over the river.



Click thumbnails to get full size images of the Omenica River Bridge.



 
Principal Client: Takla Forest Management Inc.
Client
Contact:
Name:

Position:

Address:


Phone:

Fax:
Eric Stringer

Construction Manager

1108 Sluggett Road
Brentwood Bay B.C. V8M 1E9

(250) 564-8761

(250) 564-8761
Scheduled Delivery: July 1997 Actual Delivery: July 1997
Reason for Delay:

n/a

Significant Changes Made
During Construction:
n/a
Team Members Involved: Ruskin Construction Ltd.
Key Personnel: • Andrew Purdey

Duties:

Provide contract Management, and prepare resources for project execution. Prepare the design build proposal.

Responsibility:

Review projects schedule and costs weekly, direct the allocation of resources and construction procedures.


• Rod Cleave

Duties:

Provide day to day on site project management.

Responsibility:

Maintain daily schedule and cost control trouble shoot and changes to site conditions.

Relevant Skills: This project is located near the subject job site, we undertook the hiring of local workers from the Takla band office, adn preformed the construction systematically with access to one side of the structure only.
Safety & WCB Record: This project required water access to each pier location, no infractions or lost time accidents were reported.
Environmental Record: This project was completed in a sensitive management area, which required our construction plan to address all Environmental issues. No infractions or incidents occurred on this site.
Quality Management Experience: Provided all materials and services to the requirement of the specification.
Services Used:

Industrial Bridge Construction

Concept Through Cosntruction