Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 



Description:
The Muskwa River Bridge project, located in Fort Nelson BC is a critical link to Slocan’s fibre supply. The project included the construction of a 1.5 km stretch of road including a 268-m bridge. A team commitment with the owner, engineer, road contractor and governing agencies ensured a successful project completed on time and on budget. The foundation for the project was executed during mid winter conditions. The superstructure steel was launched all from one side during summer months.



Click thumbnails to get full size images of the Muska River Bridge.

 
Principal Client: Slocan Group – Fort Nelson Operations
Client
Contact:
Name:

Position:

Address:


Phone:

Fax:
Vlad Petrlak

Road Superintendent

Mile 294 Alaska Highway
Fort Nelson BC V0J 2C0

(250) 233-6583

(250) 997-2533
Scheduled Delivery: September 2002 Actual Delivery: July 2002
Reason for Delay:

n/a

Significant Changes Made
During Construction:
n/a
Team Members Involved: Kledo Construction Ltd.
Key Personnel: Greg Brown / Andrew Purdey

Duties:

Provide project construction team to deliver a safe and on schedule project.

Responsibility:

Prepare construction procedures, execution of safety and operational plan. Procure and deliver materials in a synchronized manner. Work with all stakeholders to deliver the project on time in harsh winter conditions.

Relevant Skills: Working with a client to deliver a product, which satisfied all schedule and design needs, while bringing the project in under budget.
Safety & WCB Record: This project required the constant flow of construction traffic through the site, detours and signage insured no incidents.
Environmental Record: All work was completed within the guidelines presented by the controlling agencies.
Quality Management Experience: All materials and services supplied to specification.
Services Used:

Industrial Bridge Construction

Pile Driving

First Nations Partnering