Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 



Description:
The construction of a 130m long x 9m wide multi span structure with a cast in-place concrete deck over the Murray River near Tumbler Ridge. This project was constructed in the mid winter season due to environmental and pier access reasons.

The foundation consisted of concrete filled rock socketed piling. The superstructure was a four girder steel section launched as a complete unit into place.

Ruskin value engineered a cast-in-place pre-cast form which allowed for the timely completion of the project a mere 6 weeks from award. Once the cast in-place deck was completed a high density overlay was installed and successfully cured in late winter conditions...



 
Principal Client: B.C. Forest Service
Client
Contact:
Name:

Position:

Address:


Phone:

Fax:
Vladamir Paschnicy

Regional Engineer

Scheduled Delivery: March 1996 Actual Delivery: March 1996
Reason for Delay: n/a
Significant Changes Made
During Construction:
Modified the cast-in-place deck with a pre-cast sub-deck which provided the same end product and shaved 3 weeks off of the schedule.
Team Members Involved: Geo-North Consulting, Kingston Construction, Triple D Drilling
Key Personnel: • Andrew Purdey project manager
• Tom Bamsy site superintendent
Relevant Skills: Construct a major project in a 7 week span during the middle of winter with a cast-in-place deck. Construction of an access ice bridge to drill the pier pile locations.
Safety & WCB Record: No lost time accidents
Environmental Record: No environmental incidents
Quality Management Experience: All materials delivered and installed as per the specifications.
Services Used: Industrial Bridge Construction

Drilling & Cassion Foundations