MILE 69.9 REPAIRS
Description: This project involved the repair of Savage's largest wooden trestle bridge on their Grande Cache line, Mile 69.9 Bridge. Major works included levelling the deck with full length treated shims, retrofitting an existing pumping pile with a new CIP foundation, replacement of damaged caps and stringers, and replacement of binwalls.
Click thumbnails to view full size images of the Mile 69.9 Repairs.
   
 
Client: Savage Alberta Rail
Location: Grande Cache, AB
Project Dates: November 2006 - January 2007
Ruskin Key Personnel: Jim Basha
Client Contact:
Kenny Mitchell
Tel: 780-831-0400






Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge