Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 




Description:

This project included the supply of an 180m-work trestle, design and installation of five cofferdam cells, and the erection of 36 pre-cast girders.








Click thumbnails to get full size images of the John Hart Bridge.




 
Principal Client: Walter Construction
Client
Contact:
Name:

Position:

Address:

Phone:

Fax:
Joseph Hanna, P.Eng.

Project Manager

Vancouver

604.279.0707

Scheduled Delivery: May 2002 Actual Delivery: May 2002
Reason for Delay: n/a
Estimated Construction Cost:
3 million Final Construction Cost: 3 million
Significant Changes Made
During Construction:
Change from a pile foundation to a sheet pile cell cast in-place spread footing.
Team Members Involved: Walter, SNC-Lavalin
Key Personnel: Andrew Purdey, Rod Cleave


Duties:
Provide project construction team to deliver a safe and on schedule project.

Responsibility:
Prepare construction procedures, execution of safety and operational plan. Manage logistic of material deliveries to ensure steady flow of construction. Work with all stakeholders to deliver the project on time in harsh winter conditions.
Relevant Skills: Working with the project team to change the design of the foundation from piling to cofferdam cells.
Safety & WCB Record: No lost time accidents.
Environmental Record: All work was completed within the guidelines presented by the controlling agencies.
Quality Management Experience:
All materials and services supplied to specification.
Services Used:

Sheet Pile Cofferdam Construction
Pile Driving
Sub-Contract Services