Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 



Description:
The construction of a 125m long x 5m wide multi span structure with a pre-cast deck over the Ingenika River near Mackenzie. This project was constructed in phases to suit the cash-flow requirements of the owner.

The foundation consisted of pipe piles driven to practical refusal. The superstructure was made up of surplus spans provided by the owner. The deck consisted of pre-cast concrete panels.

The project was completed with First Nations involvement as this structure provided all season road access to the Ingenika and Ft. Ware first nations.


Click thumbnails to get full size images of the Ingenika River Bridge .



 
Principal Client: Abitibi Consolidated Inc.
Client
Contact:
Name:

Position:

Address:

Phone:

Fax:
Les Skaalid

Woods Manager

MacKenzie

(250) 997-2775

(250) 997-2709
Scheduled Delivery: March 1997 Actual Delivery: March 1997
Reason for Delay: n/a
Significant Changes Made
During Construction:
Designed and constructed the substructure to suite the surplus superstructure the client had in inventory.
Team Members Involved: All-North Consultants
Key Personnel: • Andrew Purdey project manager
• Rod Cleave site superintendent.
Relevant Skills: Construct a major project in stages to accommodate the client’s budget with total First Nation’s involvement.
Safety & WCB Record: No lost time accidents
Environmental Record: No environmental incidents
Quality Management Experience: All materials delivered and installed as per the specifications.
Services Used: Industrial Bridge Construction

Concept Through Construction