EL SMITH WATER INTAKE PROJECT
Description: This project consisted of the construction of a cast in place concrete water intake structure with piping under the North Saskatchewan River. Ruskin Construction Ltd was responsible for the temporary works, which included a 160m long workbridge and a 3-phase cofferdam system. The cofferdam system allowed for the water intake and pipes to be installed in dry conditions 5.4m below the riverbed.
Click thumbnails to view full size images of the EL Smith Water Intake Project.
     
   
 
Client: Clark Builders.
Location: Edmonton, AB
Project Dates: 2006-2007
Team Members:
Allnorth Consultants, Global Earth Solutions
Ruskin Key Personnel:
Andrew Purdey
Joseph Hanna
Rod Cleave
Client Contact:
Rob Graham
Clark Builders
Phone: 780-412-3892
Fax: 780-237-4035






Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge