Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 



Description:

Petro Canada required a waste water line under the Strathcona Pedestrian Bridge (1100 ft. long) and the Ainsworth Pedestrian Bridge (934 ft. long) to take waste water from the city to the refinery. The Strathcona was completed by building a walkway the entire length of the underside of the bridge. The Ainsworth was completed using a mobile trolley we designed specifically for this project, which clamped underneath the bridge and moved like a caterpillar. The entire project was completed in two months with no accidents.




Click thumbnails to get full size images of the Ogden Point project.




 
Principal Client: Ledcor
Client
Contact:
Name:
Position:
Address:
Phone:

Fax:

Jeff Watt





(780) 468-8092

Scheduled Delivery: On time Actual Delivery:  
Reason for Delay: n/a
Estimated Construction Cost: $750,000 Final Construction Cost: $750,000
Significant Changes Made
During Construction:
n/a
Team Members Involved: Ruskin Construction Ltd., Ledcor Group
Key Personnel:

Jim Brown, Ruskin Construction Ltd.
Dennis Hicks, Ruskin Construction Ltd.
Terry Reinert, Ruskin Construction Ltd.

Relevant Skills:

Ability to design and construct a solution to suit our client’s requirements.

Safety & WCB Record:

No Accidents

Environmental Record: No Infractions
Services Used: Industrial Bridge Construction