Description:
Petro Canada required a waste water
line under the Strathcona Pedestrian Bridge (1100 ft. long) and the Ainsworth
Pedestrian Bridge (934 ft. long) to take waste water from the city to the
refinery. The Strathcona was completed by building a walkway the entire length
of the underside of the bridge. The Ainsworth was completed using a mobile
trolley we designed specifically for this project, which clamped underneath the
bridge and moved like a caterpillar. The entire project was completed in two
months with no accidents.
Click thumbnails to get full size images of the Ogden Point
project.

|
| |
| Principal
Client: |
Ledcor |
Client Contact: |
Name: Position: Address: Phone: Fax: |
Jeff Watt (780)
468-8092 |
| Scheduled Delivery: |
On time |
Actual
Delivery: |
|
| Reason for
Delay: |
n/a |
| Estimated
Construction Cost: |
$750,000 |
Final Construction
Cost: |
$750,000 |
Significant Changes
Made During Construction:
|
n/a |
| Team Members
Involved: |
Ruskin Construction
Ltd., Ledcor Group |
| Key
Personnel: |
• Jim Brown, Ruskin
Construction Ltd. • Dennis Hicks, Ruskin Construction
Ltd. • Terry Reinert, Ruskin Construction Ltd.
|
| Relevant Skills: |
Ability to design and construct a solution to
suit our client’s requirements. |
| Safety
& WCB Record: |
No Accidents |
| Environmental Record: |
No Infractions
|
| Services Used: |
Industrial Bridge
Construction |
|
|
|