Description: This project involved the installation of 166 drilled piles in a marine environment. Ninety percent of the piles were 5.0m sockets, the remainder were 1.2m sockets. Piles were 24 inches in diameter with a half-inch wall.
Click thumbnails to view full size images of the Dung Quat Piling Project.
   
 
Client: Dung Quat Oil Refinery
Location: Hanoi, Vietnam
Project Dates: 2006 - 2007
Ruskin Key Personnel:
Andrew Purdey
Joseph Hanna
Renton Dooley
Client Contact:
Vo Thanh Minh
M&H Industries & Co.
Tel: 84 49437845
Email: minhvt@fpt.vn






Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge