Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 



Description:
The 64-m long bridge over the Dunedin River was constructed without the ability to gain equipment access to the high chainage abutment. The structure crosses a sedimentary rock gorge and is located 15-m above the river level. The foundation consists of cast-in-place footings with Dywidag rock anchors. The superstructure is a continuous composite bridge. Construction occurred during winter conditions which added to the complexity given the cast-in-place footings in the remote location.


Click thumbnails to get full size images of the Dunedin River Bridge.


 
Principal Client: Slocan Group - Fort Nelson Operations
Client
Contact:
Name:

Position:

Address:


Phone:

Fax:
Lance Yarham

Roads Superintendent

Mile 294 Alaska Highway
Fort Nelson BC VOC 1R0

(250) 233-6583

(250) 233-6565
Scheduled Delivery: September, 2000 Actual Delivery: September, 2000
Reason for Delay: n/a
Significant Changes Made
During Construction:
No changes required.
Team Members Involved: Amec Earth and Environmental Ltd. / Triton Environmental Ltd. / Ruskin Construction Ltd.
Key Personnel: • Darby Kreitz PEng

Duties:

Provide structural review and civil design, tender document and construction management.

Responsibility:

Carry out site survey, structural and civil design, preparation of tender documents, tendering process, contract management, construction supervision and payment approvals.

• Don Williams PEng

Duties:

Provide structural design and construction engineering.

Responsibility:

Carry out structural and construction design.


Relevant Skills: Project Management, Bridge Structural Design, Roadway Design, Hydraulic Analysis, Traffic Management, Landscape Design.
Quality Management Experience: Worked with design team to provide solutions and recommendations for entire project. Carrying out construction management to ensure all design aspects were adhered to during construction.
Services Used: Industrial Bridge Construction