Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 




Description:

The supply and installation of approximately 500 piles at a new ship building facility in Victoria area.

The job will require the drilling and installation of 20" pipe piles drilled through 9m-0f overburden into the rock to a socket depth of 1m. The piles where then tapped into place with a conventional hammer once the drill string has been removed.


Click thumbnails to get full size images of the CFB Esquimalt Project.



 
Principal Client: Defense Canada
Client
Contact:
Name:

Position:

Address:


Phone:

Fax:
Jeff Duffield (Monad Contractors LTD)

Project Manager

P.O. Box 17000 Stn Forces
Victoria B.C. V9A 7N2

(250) 386-7441

(250) 386-7444
Scheduled Delivery: 06/30/04
Actual Delivery: In Construction
Reason for Delay: n/a
Significant Changes Made
During Construction:
 
Team Members Involved: Monad, Thurber
Key Personnel: Andrew Purdey. Gord Plecas

Duties:

Provide project construction team to deliver a safe and on schedule project.

Responsibility:

Prepare construction procedures, execution of safety and operational plan. Manage logistic of material deliveries to ensure steady flow of construction. Work with all stakeholders to deliver the project on time in harsh winter conditions.

Relevant Skills: Provide team work to work in a very tight site. All of the piling required drilling into the rock strata to varying depths. Quality control was a key factor in the successful delivery of this service.
Safety & WCB Record: One lost time accident.
Environmental Record: All work was completed within the guidelines presented by the controlling agencies.
Quality Management Experience: All materials and services supplied to specification.
Services Used:

Drilling & Cassion Foundations

Pile Driving

Sub-Contract Services