Philip Causeway Bridge

Machmell River Bridge

Dunedin River Bridge

Murray River Bridge

John Hart Bridge

Ingenika River Bridge

Unnamed Creek 82 km Finlay FSR

Unnamed Creek km 8 Finlay FSR N.

North Saskatchewan River Bridge

BC Rail Rutherford Bridge

Bonsall Bridge

Mackenzie Winter Road

CFB Esquimalt

Muskwa River Bridge

Ocean Falls Hatchery

Ogden Point

Brilliant Dam Project

South Jetty

Wapiti River

Omineca River Bridge

Railink, Manning, Alberta

Kelowna Pacific Railway

Lakeland Railway

Mackenzie North

Sooke Rotary Pier

300 ft Pipeline Truss - Berland River

Fort Nelson River Bridge

Edmonton Waste Water Line

Bow River Bridge

Waskahigan River Bridge

Serpentine River Crossing

Donjek River Bridge

Pier II, City of Kodiak

Feather River Bridge

Savage Alberta Rail

Southern Manitoba Rail

Ashlu Creek Spillway

El Smith Water Intake Project

Spectra Energy Pipeline

Sarcee Trail H-Piles

Dung Quat Piling

Salmon Kings Lodge Upgrades

Point Hope Shipyard Reconstruction

Ashnola Bridge Rehabilitation

Birch Island Bridge

Marine Load Out Facility Repair

Beachclub Phase II

POL Fuel Jetty Upgrade

Nautley River Bridge




 




Description:

Burlington Resources needed a structure to carry a
new pipeline across the Berland River. Ruskin
Construction Ltd. coordinated the design, construction
and transportation of an appropriate truss and
subsequently installed the structure. The completion of this project before the deadline was critical, as other phases of Burlington’s project depended on the truss installation.

Click thumbnails to get full size images of the 300 ft Pipeline Truss - Berland River.




 
Principal Client: Burlington Resources Canada Energy Ltd.
Client
Contact:
Name:

Position:

Address:

Phone:

Fax:
John Au



Suite 3700, 250 – 6th Ave. SW, Calgary, AB

403.260.8000

403.398.0530
Scheduled Delivery: November 19/04
Actual Delivery: November 19/04
Reason for Delay: n/a
Significant Changes Made
During Construction:
As per design
Team Members Involved: Allnorth Consultants, Rapid Span Bridges Inc.
Key Personnel: Jim Basha, P.Eng. – Project Manager

Paul Pelchat – Site Foreman


Duties:

  • Cost effective procurement of a unique structure
  • Transportation of oversized structures on highways and through municipalities.
  • Obtaining required approvals/permits
  • Coordination of resources for the installation of a clear-span structure
    in a short time frame.
Safety & WCB Record: No lost time accidents.
Environmental Record: No infractions.
Services Used:

Aerial Pipeline Construction
Pile Driving