Description: This project involved the supply and installation of approximately 410 stone columns approximately 20” in diameter, 36 (2200 feet) 324mm diameter pipe piles, and 148 (9400 feet) or 406mm diameter pipe piles.
Click
thumbnails to view full size images of the Beachclub Phase II Project.
Client: Sand Castle Holdings Location: Parksville, BC Project Dates: 2007