Send us a Message

Close

Port Mann / HWY 1 Improvement Project (PMH1)

Vancouver to Langley, British Columbia

Project Description

Over the course of 3 years, Ruskin installed over 200 large diameter foundation piles, both driven and drilled, for 10 structures on the new 10-lane Port Mann Bridge. Pile diameters on the structures varied from 610mm to 2438mm, with drilled shafts up to 56 metres deep. We also installed 3 sheet pile walls and placed over 5000m3 of concrete on the project.

Ruskin worked diligently throughout the contract to develop innovative ways to overcome significant challenges to our operations on the project. These challenges included extremely difficult and unpredictable soil conditions, massive subsurface boulders, the presence of an Artesian Aquifer, varying elevations, overhead power lines, working around existing highways, freeways and other structures, as well as meeting a very strict construction schedule.

Client
Kiewit-Flatiron GP
1410-1111 W. Georgia Street
Vancouver, BC  V6E 4M3

 

Bookmark the permalink.

Comments are closed.